High Performance Epoxy Flooring Built for Military Spaces
Used by US Navy and DoD Facilities to Increase Operational Effectiveness
Our strategic focus is installing floors that increase your team's operational success.
Why Military Leaders Trust Us
As a military leader, you need flooring solutions that can withstand the relentless demands of mission-critical environments. From heavy machinery and foot traffic to extreme weather and corrosive chemicals, your decks and operational spaces take a beating every day. Substandard coatings don’t just wear down—they create hazards, compromise safety, and increase costly maintenance cycles.
At Defense Flooring, we don’t just apply epoxy—we engineer military-grade, battle tested flooring systems designed to outlast, outperform, and exceed the toughest DoD situations. Our solutions are trusted aboard aircraft carriers, naval warships, military hangars, and base facilities worldwide —ensuring your infrastructure remains safe, durable, and fully operational in even the harshest conditions.
WHY LEADERS CHOOSE US:
SUPERIOR PRODUCTS
We offer robust flooring systems designed to withstand the demands of fully operational military workspaces.
QUICK TURN-AROUND
Our streamlined systems minimize downtime during epoxy flooring installations, ensuring your project runs efficiently.
FLEXIBLE SCHEDULING
Our dynamic team adapts to changing military schedules, making your epoxy flooring project hassle-free with minimal disruption.
PROFESSIONALISM
We proudly serve our military clients with respect, clear communication, and expert execution. Our team includes veterans passionate about maintaining military infrastructure.
Maverick Elite
Flooring System
The #1 system for Aircraft hangars.
Hazard lines and striping options available.
Here's what you get:
Exceptional durability for operational environments
Better FOD Detection & cleanability
Non-slip options to enhance safety
Extremely presentable look for ceremonial use
Floor Lifespan: 15-25 years w/ proper maintenance.
1-2 week install timeline
Warehouse Elite Flooring System
The #1 system for warehouses and industrial areas.
Symbol inlay options available.
Here's what you get:
Built to withstand heavy equipment use & pallets
Resistant to Oil & Grease spills
Marking options for efficient inventorying
Safety aspects to avoid costly accidents
Floor Lifespan: 15-25 years w/ proper maintenance.
1-2 week install timeline
EXPERIENCE
FOR OVER A DECADE, WE'VE PROUDLY COLLABORATED WITH THE UNITED STATES MILITARY, FOSTERING A DEEP-ROOTED PARTNERSHIP BUILT ON TRUST AND EXCELLENCE. OUR EXTENSIVE EXPERIENCE SPANS A VARIETY OF ENGAGEMENTS, WITH A PRIMARY FOCUS ON SUPPORTING US NAVY COMMANDS. FROM THE DECKS OF DIVERSE SHIP CLASSES TO THE EXPANSIVE HANGARS OF VARIOUS SQUADRONS, WE'VE LEFT OUR MARK IN EVERY CORNER WE'VE WORKED.
NO PROJECT IS TOO BIG OR TOO SMALL FOR OUR DEDICATED TEAM. WHETHER IT'S ENHANCING THE FUNCTIONALITY OF A NAVAL VESSEL OR OPTIMIZING THE WORKSPACE IN A SQUADRON HANGAR, WE APPROACH EACH TASK WITH THE SAME LEVEL OF COMMITMENT AND PRECISION. OUR GOAL REMAINS STEADFAST: TO DELIVER SUPERIOR RESULTS THAT EXCEED EXPECTATIONS AND CONTRIBUTE TO THE OPERATIONAL SUCCESS OF OUR MILITARY PARTNERS.
LEADERSHIP TEAM
Rebecca Birsch
Founder, Specialty Chemical Corp & DefenseFlooring.com
Luis "Rod" Rodriguez
Install Supervisor- East/West
Todd Liebig
Solutions Rep- West Coast
Demetrius "DJ" Johnson
Solutions Rep- East Coast
Mike Bobay
Operations Manager
Frequently Asked Questions
That all depends on the size/condition of the floor. If the existing floor or concrete is in good condition, we can typically hit the following timelines:
0-10,000 SQFT: 1 Week Installation
10,000-50,000 SQFT: 2 Week Installation
50,000 and Above: 3-4 Week Installation
One of our Product Representatives for your area would be happy to give you a timeline for your floor project. Get in touch with us, and we will connect you directly with your Area's Representative.
We work with multiple different Procurement Partners and agencies that allow you to fund your project quickly. Depending on your command, project details, and size of the project, certain payments can be routed same-day.
Please get connected with us to start the process.
We pride ourselves on having a quick turnaround time while maintaining high quality in our project. Most of our projects have about 1 Month of lead time before work starts, but we can accomodate your needs if an immediate start is required. Please communicate with one of our Product/Project Representatives to see our Install Team's current availability.
Get In Touch
Email: [email protected]
Address
Headquarters:
476 Viking Dr, Virginia Beach, VA 23452
West Coast Office:
1121 Bay Blvd, STE E, Chula Vista, CA 91911
Office Assistance Hours
Mon – Fri 8:30am – 4:30pm
Saturday/Sunday – CLOSED
Phone Number:
+1 410-564-4292
Office: 476 Viking Dr, Virginia Beach, VA 23452
1121 Bay Blvd, STE E, Chula Vista, CA 91911
Call
+1 410-564-4292
Email: [email protected]
Site: www.defenseflooring.com